Blog

--

Data Center Facilities – Management Overview

1- Building Management System (BMS)

1.1- Security and Access Control

  • User profile and role management
  • Access rights management
  • Comprehensive standard and customized reports

1.2- Fire and Smoke Control

  • Multi-sensor detectors provide early warning of smoke and fire conditions.
  • This system could be integrated with other applications to activate public address systems, control fans and dampers and release fire doors for evacuation.
Rate this blog entry:
5
Continue reading
3192 Hits

Switchgear Manufacturing

1. DESIGN & ENGINEERING PROCESS

1.1 New Order

After receiving an order, project file which includes Contract,technical specifications and Scope of supply etc. is given to Design & Engineering Manager for review and project planning.

Design & Engineering manager assigns one Electric Design engineer who is going to handle this project. Project file is also checked by Electric Design engineer.

1.2 Project Kick-Off

To Design & Orderhandling from Bid & Proposal :
Contract,technical specifications, Scope of supply and technical data sheet are handed over Electric design engineer.

Rate this blog entry:
20
Continue reading
5155 Hits

AutoTranslation

Web Traffic

71540
This WeekThis Week428
This MonthThis Month1382
216.73.216.13

Random Post

Low Voltage Switchgear and Controlgear Assemblies: BS EN 60439-1: 1994 (IEC 439-1) Including Amendment No1: 1995 INTRODUCTION TO EIEMA EIEMA the Electrical Installation Equipment Manufa...
Rate this blog entry:
3
2805 hits

Most Popular

Cash is a medium of exchange for goods and services. Cash provides flexibility. Cash flow equals cash receipts minus cash payments over a given period of time. When you sell a product, you can...
Rate this blog entry:
25
7123 hits